PRODUCTS USED
The 15.7-acre property is divided by Boulder Canyon Drive east of the existing building with Boulder Creek running alongside the east of the road. The property west of the existing building slopes almost vertically and is rocky.
The system needed to be installed outside of the Colorado Department of Transportation (CDOT) right of way. The cost to build a road and blast the rock on top of the mountain was not feasible. Installing part of the drainfield to the south of the building was originally planned, but then the county required the installation of 80,000-gallons of fifire cistern capacity.
Kate Carney, P.E., with Church Onsite Wastewater Consultants designed a system consisting of a 1,000-gallon grease interceptor tank, two 2,000-gallon single compartment septic tanks, a 2,000-gallon, recirculation/dosing tank, an Orenco AX-100 recirculating media filter and a pressurized open bottom sand filter consisting of 168 Infiltrator H-20 traffic rated chambers under the parking lot. Matthew Morgan and the team at CWS Excavating completed the installation of this system.
The installation included craning the septic tanks over the building to avoid shutting down the busy road. There was limited area for the tanks to be installed outside of the CDOT right of way. Access to import sand to the area was affected by the busy road and entrance on a curve. Due to limited access, CWS Excavating had to first install the water cistern tanks before the soil treatment area.