Here. There. Everywhere

Manufactured in Florida and engineered to exceed specifications, ADS pipe provides cost and time savings.

Stacked HP Pipe
Engineered for Performance
An innovative, safer solution.
Local & State Project Highlights
Over 100 million feet in Florida and growing.
Connect With a Rep
Questions?

Building Orlando

Mask Group 707

Building Orlando

ADS pipe is locally manufactured, fast to ship, and three times faster to install than traditional pipe. Infrastructure and construction projects throughout Orange County can be completed faster, getting traffic back to normal and crews onto other projects.

Keep Orange County workers safe.

Small-HP Pipe ready to install

Keep Orange County workers safe.

Lightweight building materials create a safer working environment. An eight-foot piece of reinforced concrete pipe weighs 3,300 pounds. A 20-foot piece of HP Storm pipe weighs less than 400 pounds.

Did you know?

ADS pipe is safer and 3 times faster to install.

Spec the Pipe Engineered for Performance.

Mask Group 841

Spec the Pipe Engineered for Performance.

Our HP pipe features extended bell and spigot joints with a standard rubber gasket that exceeds 25 feet of head pressure per ASTM D3212. HP pipe also has a 100-year design life and is corrosion resistant; unaffected by salts, most chemicals, and “hot” soils.

Boost Your Bottom Line with Confidence.

Amazon Gainesville

Boost Your Bottom Line with Confidence.

Counties across Florida are building smarter and stretching taxpayers’ dollars by switching to ADS pipe. Experience up-front material cost savings as well as fuel, labor, and equipment savings due to less handling and fewer fabric wrapping joints. Contractors profit from shorter timelines.

Connect with a Rep

Please complete the following form to be contacted by an ADS representative. All fields are required unless otherwise stated.

contact_rep

Local & State Project Highlights

Results:

  • Optimized Project
  • Superior Constructibility
  • Time and money saved - Increased productivity and profitability

Results:

  • Optimized Project
  • Superior Constructibility
  • Time and money saved - Increased productivity and profitability
  • Inserta Tees - most effective option used to connect 18" HP Pipe to mainline from concrete flume

Orange Line Tri-Rail

  • Provided connectivity between the MIA, Tri-Rail, and RCC Centers
  • Widened local roads
  • Drainage Improvements
  • 6,600 LF of pipe

Phase 1:

  • Widen MacArthur Causeway
  • Connect Causeway to Dodge Island
  • Create direct access between seaport and I-395 & I-95
  • 7,000 LF of pipe

At NW 122nd St.:

  • Widen ramps and junction with NW 122nd St.
  • Enhance traffic flow and safety
  • Perform drainage improvements
  • New sidewalks, curbs and landscaping
  • 3,500 LF of Pipe

At SW 40th St., Temporary Drainage:

  • Widen SR 826 North of SW 40th St. & South of SW 56th St.
  • Widen ramps to Don Shula Expressway SR 874
  • 2,000 LF of Pipe

Our Florida Partners