HP Storm Installation Guide with Resilient MH Connection
Filename:
HP Storm Installation Guide with Resilient MH Connection.pdf

This document is the HP Storm Installation Guide with Resilient MH Connection. 9 steps and 3 tables describe the process.
Step 1 describes pipe handling and storage. Step 2, trench width recommendations. Step 3, preparation of bedding materials. Step 4, pipe joint assembly. Step 5, placing materials into haunch area. Step 6, compact backfill in lifts. Step 7, compact over top of pipe. Step 8, resilient connection to structure. Step 9, compact backfill around structure.
3 tables confirm the maximum & minimum cover, minimum cover for construction vehicles & flotation and backfill classifications.
Photos and illustrations included.