1201 Green Layout Installation (Perf HDPE) Detail
Filename:
1201 Green Layout Installation (Perf HDPE) Detail.dwg
This document is the drawing for the 1201 Green Layout Installation (Perf HDPE) Detail, showing how to install the green.
The Green Profile is a drawing showing the construction of the entire putting green. It includes the bunker with the location of the outlet indicated. This drawing shows the direction of the drainage on the green, the location of the green, where the perforated HDPE pipe and front perimeter drain go, and the 4” - 6” HDPE Pipe trench to the lower drainage area. Reference notes indicate to never connect bunker lines to any part of the greens drainage system.