The project utilized funds from SHOPP, Sacramento Measure A and SB1.
PRODUCTS USED
- 3,500’ (1,067 m) of 18” (450 mm) N-12® Dual Wall HDPE Pipe
- 100’ (7,620 m) of 12”-60” (300-1500 mm) N-12® Dual Wall HDPE Pipe
- 200' (62 m) of 30" (750 mm) N-12® Dual Wall HDPE Pipe
- 550' (168 m) of 36" (900 mm) N-12® Dual Wall HDPE Pipe
The project consisted of storm drain improvements, pavement rehabilitation and HOV (High-Occupancy Vehicle) lanes to allow for improved connectivity and reliability of travel along the 50 Corridor in Sacramento.
N-12 pipe was utilized to provide storm drain solutions to the Flatiron Design/Build team. N-12 allowed for the successful completion of storm drain phases because reinforced concrete pipe (RCP) was bogged down by supply restraints and failed post-installation inspections.
N-12 was able to pass cost savings along to Caltrans through direct material costs, reduced transportation costs and speed of installation