N-12
Saves Time, Money on California Highway 50

Location:
Sacramento, CA
Installation Date:
2020

Owner:
Caltrans District 3

Engineer:
Caltrans District 3

Contractor:
Flatiron Construction
California Highway 50
The “Fix 50” Project is a collaborative effort between the Sacramento Transportation Authority, Sacramento Area Council of Governments (SACOG), Sacramento Regional Transit and Caltrans District 3.

The project utilized funds from SHOPP, Sacramento Measure A and SB1.

PRODUCTS USED

The project consisted of storm drain improvements, pavement rehabilitation and HOV (High-Occupancy Vehicle) lanes to allow for improved connectivity and reliability of travel along the 50 Corridor in Sacramento. 

N-12 pipe was utilized to provide storm drain solutions to the Flatiron Design/Build team. N-12 allowed for the successful completion of storm drain phases because reinforced concrete pipe (RCP) was bogged down by supply restraints and failed post-installation inspections.

N-12 was able to pass cost savings along to Caltrans through direct material costs, reduced transportation costs and speed of installation