StormTech Engineers

2021-11-16_10h42_23

Start Your Next Project

Ready to dig in? Use our Design Tool to start building your project.

Get Started

Why Choose StormTech Chambers? 

StormTech provides unsurpassed value engineering of any underground detention system, especially 60"-72" (1524mm-1828.8mm) corrugated metal pipe (CMP). Cost savings and longer life expectancies are not the only benefits from using StormTech chambers.

Chamber systems are assembled quicker (30-50%), easier and with less machine time. A 300 chamber SC-740 system can be installed in less than 2 days. That's equivalent to 1,250 lineal feet of 60" diameter pipe!

StormTech Design Toolgi-features-economic

In addition to providing site calculations, the design tool can provide a conceptual plan in both PDF and CAD formats. Your local representative can also provide an installed cost estimate upon request.

Learn More

Acceptable Geotextiles

Detailed overview of acceptable geotextiles from various manufacturers.

Learn More

 

Acceptable Fill Materials

Detailed information about the fill material specifications and locations within the system.

Learn More

 

AASHTO/ASTM Standards

We design in accordance with Section 12.12 of the AASHTO LRFD Bridge Design Specifications.

Learn More