Tuscaloosa
Regional Airport

Location:
Tuscaloosa, AL
Installation Date:
2017

Owner:
Tuscaloosa Regional Airport

Engineer:
Atkins

Contractor:
REV Construction Inc.
Sinkholes were developing along the Tuscaloosa Regional Airport’s main runway and the decision was made to use HP Storm, a polypropylene pipe with high-integrity joints, to replace Class III reinforced concrete pipe. 

PRODUCTS USED

The pipe system was installed between the airport’s primary runway, Runway 4-22, and the principle parallel taxiway.

By utilizing polypropylene pipe, the contractor was using 20’ (6 m) pipe sections to replace the 4’ (1.2 m) sections of RCP. The 20’ (6 m) sections have far fewer joints within the system meaning far less chance for a potential joint failure. In addition, 20’ (6 m) sections install more quickly and the installation was completed in 116 days, well in advance of the contract specified 140-day time limit.

Double gaskets were also used on the pipe’s joints to reduce the opportunities for sediment to infiltrate the system. This provided an additional measure of sealing beyond typical soil tightness to meet the 10.8 psi criteria for watertightness.

Microsoft will be phasing out Internet Explorer soon. Because of this, we did not build the site to be used with IE. Please use Chrome, Edge or another browser to fully experience the new ADS website. .